Skip to content
Travel

Malaysia Completes Longest Rail Tunnel in South East Asia

Singapore News Editorial team · AI-written, reviewed under our editorial standards · · Reading time 10min read · Views 0 ·
Key — Malaysia completed the longest rail tunnel in South East Asia connecting Gombak and Bentong.

The Genting Tunnel, a twin-bore structure located beneath the Titiwangsa Range, successfully connects Gombak in Selangor and Bentong in Pahang. This massive infrastructure project represents the longest rail tunnel in both Malaysia and South East Asia. The tunnel measures 16.39 kilometres in total length, marking a significant engineering achievement for the nation's railway network. The completion of this tunnel marks a major milestone in the development of the East Coast Rail Link project.

Tunnel Construction Details

The construction of the Genting Tunnel faced considerable challenges due to varying geological conditions beneath the 300-million-year-old Titiwangsa Range. The terrain beneath the tunnel consists predominantly of hard granite, requiring specialized excavation techniques. To overcome these geological obstacles, a custom-built, one-of-a-kind open-type hard-rock tunnel boring machine was deployed. This specialized machinery allowed engineers to safely navigate the complex subterranean environment.

The tunnel boring machine itself is a substantial piece of engineering equipment. It measures 266 metres in length and possesses a boring diameter of 8.98 metres. The machine weighs approximately 1,600 tonnes, representing a significant logistical undertaking. The cutterhead at the front of the TBM weighs approximately 900 tonnes and measures 25 metres in length. This powerful cutting head also has a diameter of 8.98 metres, designed to bore through the hard granite rock effectively.

Tunnelling Progress and Timeline

The tunnelling work required approximately two years to complete successfully. A major breakthrough in the construction process occurred on July 12, 2025. This specific date marks a critical point in the project timeline, demonstrating the steady progress made by the construction teams. The tunnelling operation proceeded under demanding conditions, requiring precise coordination between engineering teams and construction supervisors.

The tunnel boring machine operates at a maximum rate of 700 metres per month. This rate of advance allowed the construction teams to make consistent progress throughout the two-year period. The deployment of the TBM was managed by China Communications Construction Group in Shanghai. This international collaboration highlights the technical expertise brought to bear on this complex infrastructure project. The successful operation of the TBM was crucial for maintaining the project schedule.

Operational Specifications and Performance

Once operational, the tunnel is designed to accommodate high-speed rail traffic efficiently. A train traverses the tunnel in approximately 6.2 minutes. This transit time is achieved while maintaining an average cruising speed of 160 kilometres per hour. This operational speed demonstrates the high capacity and efficiency of the completed rail link. The tunnel's design ensures that passenger and freight services can move through the mountain range rapidly and reliably.

Mohd Rahiman Ab Rahman, the East Coast Rail Link Head of Infrastructure Design, confirmed the operational parameters. Mohd Rahiman Ab Rahman stated that the tunnel takes approximately 6.2 minutes to traverse at an average cruising speed of 160 kilometres per hour. This statement provides a clear metric for the operational performance of the completed infrastructure. The successful integration of the tunnel into the East Coast Rail Link network completes a vital piece of national transportation infrastructure.

Glossary

  • Gombak — Gombak is a location in Selangor. It is a point connected by the Genting Tunnel. The Genting Tunnel is a twin-bore structure located beneath the Titiwangsa Range.
  • Selangor — Selangor is a location in Malaysia. It is a point connected by the Genting Tunnel. The Genting Tunnel is a twin-bore structure located beneath the Titiwangsa Range.
  • Pahang — Pahang is a location in Malaysia. It is a point connected by the Genting Tunnel. The Genting Tunnel is a twin-bore structure located beneath the Titiwangsa Range.
  • TBM — TBM is a type of tunnel boring machine. It is a specialized piece of engineering equipment. It is used to bore through hard granite rock effectively.
  • Titiwangsa Range — The Titiwangsa Range is a mountain range that passes along the eastern borders of Perak. Its highest point is Mount Korbu. The range is characterized by eruptive masses that form the hills and mountain ranges of Perak.

This article was written with AI assistance from multiple news reports and is reviewed by our editors under our editorial principles. Editorial Standards · Tips & Contact

How did you like this post?

Comments 0

Be the first to comment

Contact us

← Singapore News Home
Singapore News Get new posts by emailSubscribe to receive new content via email. Unsubscribe anytime.
Was this helpful?Share it with friends & social